Location: Chiang Mai, Thailand
Date: June 2025
Solution:Modular Cabin Units (M7, 36 m² × 10 units).
15 kW Solar Power System + 5 kW Wind Turbine.
30 kWh Energy Storage System.
Advanced Water Treatment System (A/O + MBR + Disinfection, 5 tons/day capacity).
Location: Palawan, Philippines
Date: March 2025
Solution:Light Steel Modular House (70 m², 2-story layout)
5 kW Solar Power System + 2 kW Vertical Wind Turbine
10 kWh Energy Storage System
Rainwater Harvesting & Multi-Stage Filtration System (1 ton/day capacity)
Location: Queensland, Australia
Date: September 2024
Solution:Modular Housing Units (6-unit layout, total 120 m²)
8 kW Solar Power System
15 kWh Energy Storage System
Groundwater Extraction + RO Water Purification System (2 tons/day capacity)